Bug Log
Bug Log is a document that showing the number of defect such as open, closed,postpone,reopen or deferred of a particular module.
Bug Log is a document that showing the number of defect such as open, closed,postpone,reopen or deferred of a particular module.
check the expected output with the execution of different test cases is called dynamic testing.It comes under the validation process.
Some Dynamic Testing methodologies are:
1.Unit testing
2.Integration testing
3.system testing
It is a process to measure the system response time under the normal and peak load conditions.Simply we can say-load test judge the capacity of an system and to ensure that at what point the system response time will degrade.
Load testing tool:-
1.Apache JMeter
2.LoadRunner
3.NeoLoad
4.Silk Performer
5.Telerik Test Studio
High level test cases covers the major functionality like flow of the application and data base test cases.
Low level test cases covers the User Interface of the application. How a user can easy interact with the application.
Entry criteria start when testing process comes in system. Steps involved in this phase
1. BRS (Business Requirement Specification)
2. SRS (System Requirement Specification)
3. FRS (Functional Requirement Specification)
4. Use case
5. Test Case
6. Test Procedure
Exit criteria refer when the whole testing process is completed and application is ready to release.Steps involved in this phase
1. Test Plan
2. Test Case
3. Test Results
4. Test Summary Report
5. Defect Analysis report
Recent Comments